Southtowns Record

SUPPORTING DOCUMENTS-1

Government
Town of Aurora
Board
Town Board
Meeting
Mar 9, 2026
Kind
Agenda packet
Topics
Zoning and land use, Energy and data center siting, Water, sewer and drainage, Public safety, Budget and taxes, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 19 of 54

Read the whole document on one page (all 54 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

'

  Ti,  Any time limits set forth herein may beextended by mutual consent of the Planning Board
  and/or Town Board and the applicant to allow all interested parties to comment upon or
  modify any pending proposal. Notwithstanding the above, if the Town Board determines that
  it is in the best interest of the Town to expedite the review and approval or disapproval of a
  pending application, subject to the provisions of this chapter, the Town Board may notify the
  Planning Board of this determination, in which event the Planning Board will make a written
  recommendation to the Town Board to either accept a pending application without change, to
  accept a pending application subject to. certain changes, conditions or modifications or to
  reject a pending application within 60 days of the date of the Town Board’s written request.
  I.  Within 45 days of receiving a recommendation from the Planning Board, and to further aid in
  determining public opinion and concerns, the Town Board shall schedule a public hearing.
  J.  Within 45 days of, the public hearing, the Town Board shall approve, disapprove or approve
  with modifications an applicant’s final site plan. In the event that the Town Board rules that
  the site plan does not comply with Town standards or regulations or is unacceptable to the
  Town Board for any other reason, then the record of such determination shall be delivered to
  the-applicant, including a separate statement setting forth, in as much detail as needed for the
  applicant to understand the basis for such determination, the criteria used by the Town Board
  and others in the determination of disapproval.
  K.  Upon approval by the Town Board, a complete final site plan review package will be sent to
  the Code Enforcement Officer after which a building permit will be issued to the applicant if
  he, she, or it complies with all other applicable rules and regulations.
  L.  All costs incurred by the Planning Board and/or Town Board or other individuals involved in
  the site plan review for consultation fees or other expenses in connection with the review
  procedure shall be charged to and paid by the applicant, in the Town’s discretion either
  before or afier they are incurred.

95-4 Submission requirements.

  A.  The site plan submittal checklist will assist in providing the Town’s Planning Board with a
  basis for reaching a final decision regarding the recommendation of a final site pian to the
  Town Board for approval, disapproval or approval with modifications. An applicant’s
  proposed site plan and all supporting data will be submitted by and bear the official and
  signature of a licensed architect, landscape architect, professional engineer or land surveyor.
  B.  Site plan components, as allowed or required by state law, which will, to the extent deemed
  appropriate, be considered by the Town Board, Planning Board and others as part of an
  analysis of an applicant’s site plan will include the following: legal data, impact on the
  environs, natural features, existing man-made features, proposed development, impact on
  stormwater pollution and other information or materials. If a stormwater pollution prevention
  plan (SWPPP) is submitted pursuant to §95-4B(6) of this chapter, such SWPPP shall be
  considered by the Town Board, Planning Board and others as part of an analysis of an
  applicant’s site plan, and the site plan and SWPPP shall not be approved unless they comply
  with the performance and design criteria and standards in Chapter 96, Stormwater
  Management, of the Code.
  1.  Legal data