Southtowns Record

Town Board agenda packet — March 17, 2026

Government
Town of Aurora
Board
Town Board
Meeting
Mar 17, 2026
Kind
Agenda packet
Topics
Zoning and land use, Roads and traffic, Water, sewer and drainage, Budget and taxes, Public safety, Audits and oversight, Energy and data center siting, Parks and recreation

Original document

Same meeting

Text · page 20 of 33

Read the whole document on one page (all 33 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

ADDENDUM  1

  ,AN
  HYBRID
  BUILDING  SOLUTIONS
  850 Main Road, Corfu, New York 14036
  Office:  716-741-7416  Fax:  716-706-1403  www.hybridbuildingsolutions.com
  Certified WBE

February 13, 2026

  Sourcewell Price Accepted:
David Gunner  Color Selection:_ white
Town of Aurora  Client  Initial:
251 Quaker Road  Date:
East Aurora, NY

Dear David,

Please accept the following proposal for your new salt storage building with our current pricing. Pricing
valid until March 31, 2026.

72 feet wide by 100 feet long Calhoun Super Structures HT Series building, 10 foot on center truss
spacing providing a snow load capability of 58 \bs. and a minimum wind load of 102 mph. This building
would be engineered based on Low Hazard with a “C” Exposure based on 2020 NYS Codes
Building to be erected on 9’8” frost-depth precast wall foundation
13.5 ounce Non-Fire-Retardant Elite fabric keder cover with individual panels between each truss
One Elite Fabric Standard End with 4 passive vents
Hot Dipped Galvanized Steel Anchor Bolts and Epoxy included
Erected on site with OSHA certified, factory trained crew utilizing prevailing wages for Erie County
Site Specific Engineered Drawings and Reactions included for building, foundation, and bolt connections
Specific Geotechnical Requirements included
All equipment and travel expenses included
25 Year Warranty on fabric
Sourcewell Awarded
Delivered to Site  $449,943.00  Initial for Acceptance:

Add 20’ Front Wall Return
Pricing contingent on being completed at same time as building & foundation installation

  $25,766.00  Initial for Acceptance: