Text · page 5 of 39
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
e. The proposed action may diminish the capacity of a registered National Natural E3e oO oO Landmark to support the biological community it was established to protect. f. The proposed action may result in the removal of, or ground disturbance in, any E2n a oO portion of a designated significant natural community. Source: g. The proposed action may substantially interfere with nesting/breeding, foraging, or ee * f . . ‘ E2m im a over-wintering habitat for the predominant species that occupy or use the project site. h. The proposed action requires the conversion of more than 10 acres of forest, Elb ao o grassland or any other regionally or locally important habitat, Habitat type & information source: i, Proposed action (commercial, industrial or recreational projects, only) involves use of | D2q q =) herbicides or pesticides. j. Other impacts: Qo o 8. Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a, and b.) VWINo (_lvEs Uf “Yes”, answer questions a - h. If “No”, move on to Section 9. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a, The proposed action may impact soil classified within soil group 1 through 4 of the E2c, E3b o o NYS Land Classification System. b. The proposed action may sever, cross or otherwise limit access to agricultural land Ela, Elb a o (includes cropland, hayfields, pasture, vineyard, orchard, etc). ¢, The proposed action may result in the excavation or compaction of the soil profile of | E3b ia] oO active agricultural land, d, The proposed action may irreversibly convert agricultural land to non-agricultural Elb, E3a ia) o uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. e. The proposed action may disrupt or prevent installation of an agricultural land Ela, E1b a o management system, £, The proposed action may result, directly or indirectly, in increased development C2e, C3, ia o potential or pressure on farmland. D2e, D2d g. The proposed project is not consistent with the adopted municipal Farmland C2 o o Protection Plan, h, Other impacts: Oo a Page 5 of 10