Southtowns Record

SUPPORTING DOCUMENTS-2

Government
Town of Aurora
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda packet
Topics
Zoning and land use, Budget and taxes, Water, sewer and drainage, Parks and recreation, Public safety

Original document

Same meeting

Text · page 9 of 39

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

d. The proposed action may result in light shining onto adjoining properties.  D2n  Q  oO

e. The proposed action may result in lighting creating sky-glow brighter than existing  D2n, Ela  a  o
  area conditions,

f. Other impacts:  a  o

16. Impact on Human Health
  The proposed action may have an impact on human health from exposure  [LY] No  C] YES
  to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. fg. and h)
  if "Yes”, answer questions a-m.  If “No”, goto Section 17.
  Relevant  No,or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may cccur  occur
a. The proposed action is located within 1500 feet of a school, hospital, licensed day  Eld  Qo  o
  care center, group home, nursing home or retirement community,

b. The site of the proposed action is currently undergoing remediation.  Elg, Elh  o  o
c. There is a completed emergency spill remediation, or a completed environmental site  | Elg, Elh  im  oO
  remediation on, or adjacent to, the site of the proposed action.

d. The site of the action is subject to an institutional control limiting the use of the  Elg, Elh  a  ia]
  property (¢.g., easement or deed restriction),

e. The proposed action may affect institutional control measures that were put in place  Elg, Elh  Q  q
  to ensure that the site remains protective of the environment and human health,

f. The proposed action has adequate control measures in place to ensure that future  D2t  a  q
  generation, treatment and/or disposal of hazardous wastes will be protective of the
  environment and human health.

g. The proposed action involves construction or modification of a solid waste  Daq, Elf  qa  q
  management facility.

h. The proposed action may result in the unearthing of solid or hazardous waste,  D2q, Elf  ia}  a
i. The proposed action may result in an increase in the rate of disposal, or processing, of | D2r, D2s  Qo  ia]
  solid waste,

j. The proposed action may result in excavation or other disturbance within 2000 feet of  Elf, Elg  Q  Qo
  a site used for the disposal of solid or hazardous waste.  Elh
k. The proposed action may result in the migration of explosive gases from a landfill  Elf Elg  o  a
  site to adjacent off site structures,

1, The proposed action may result in the release of contaminated leachate from the  Ds, Elf,  Qo  o
  project site.  Dr

m. Other impacts:

  Page 9 of 10