titled the “Site Plan Review Code of the Town of Aurora, Erie County, and State of New
York.”

SECTION 2.  PURPOSE AND INTENT.

  The purpose of this local law is to repeal and rescind Chapter 95 “Site Plan
Review” and replace and enact a new Chapter 95 Site Plan Review.

SECTION 3.  AMENDMENT.

Chapter 95 of the Code of the Town of Aurora originally adopted on January 11, 1999, is
hereby repealed and rescinded as follows:

SECTION 1. INTENT.

The intent of a site plan review is as follows:
  H. To evaluate the intended building design in its arrangement to and its suitability to
  natural site conditions and the compatibility with surrounding land uses.
  I.  To permit the Town of Aurora to analyze development proposals in terms of their
  impacts on local growth and the need for facilities and services.
  J. To protect and provide for the public health, safety and general welfare of the
  Town.
  K. To conform with current zoning, the Official Map, and Comprehensive Plan, if any,
  now or in the future.
  L. To protect the value of land throughout the Municipality, to encourage orderly and
  beneficial development upon the land, and to minimize misunderstanding in the
  interpretation of intended land uses set forth in current zoning restrictions.
  M. To prevent the pollution of air and water, to assure the adequacy of proper
  drainage methods, and to safeguard the natural water table through responsible
  sewage removal/treatment.
  N. To provide for the preservation of open spaces through the most efficient design
  and layout of buildings, including but not limited to the use of cluster development
  of buildings on a parcel of land.

SECTION 2. APPLICABILITY; EXCEPTIONS.

  D.  All applications for building permits shall be accompanied by a site plan as
  approved by the Town Board, based on the review and recommendations of the
  Town Planning Board and, if appropriate, the Town’s Engineer, Highway
  Superintendent and/or Code Enforcement Officer and upon the opinions and
  concerns brought up at a required public hearing(s), if any.
  E.  An approved site plan need not accompany an application for a building permit
  to construct any of the following:
  5. A one-family or two-family dwelling and its permitted accessory uses or
  structures.
  6. A commercial improvement, either in the form of an addition to an existing
  structure or the construction of a new structure, which upon completion, will be
  less than 2,500 square feet. Notwithstanding this exception, if an applicant,
  during any three-year period, has engaged in a series of small improvements
  on his, her, or its property which, in the opinion of the Code Enforcement
  Officer, are intended to circumvent the requirements for a site plan review,
  Code Enforcement Officer may, in his or her reasonable judgement view all of
  those improvements in the aggregate in determining whether or not any such
  improvement or improvements would be excluded from the requirement of a
  site plan because of the amount of improved square footage involved.
  7. Improvements on agricultural properties or farms within the Town of Aurora
  which would either not otherwise be subject to the issuance of a building
  permit or which are located in the rear of existing improvements, provided that
  such improvements are located on a parcel of land of 10 acres or more.
  8. Construction for the purposes of accessibility.
  F.  Notwithstanding any other provision contained in this §95-2, a site plan review will
  be required for any commercial improvement constructed on a property which
  immediately adjoins or is directly across the street from or is within 500’ of a property
  which is zoned residential by the Town

SECTION 3. REVIEW PROCEDURES.

  M. Upon applying for a building permit which requires a site plan review, the Code
  Enforcement Officer will advise the applicant of the specific materials which need
  to be submitted to the Planning Board and/or Town Board for review. This step is
  designed to save the applicant from possible future delays. The Code Enforcement
  Officer will review the basic site design concept and advise the applicant as to
  potential problems and concerns and will assist the applicant in determining the
  information needed to begin a preliminary site plan review. In order to accomplish
  these objectives, the applicant shall provide sketches of the proposed
  development, together with an area map showing the location of the site in
  relation to neighboring points of interest.
  N. At this time, the Town’s designated state environmental quality review (SEQR) officer
  will decide if an environmental review is necessary.
  O. All materials needed for a site plan review will be filed with the Code Enforcement
  Officer, together with a completed site plan review application to be developed
  by and obtained from the Code Enforcement Officer. A nonrefundable fee, the
  exact amount of which will be established from time to time by resolution by the
  Town Board, shall be paid at that time to the Town Clerk. Thereafter, the Code
  Enforcement Officer will distribute the application to the Town Board for referral to
  the Planning Board, as well as to any other individuals, agencies or bodies that may
  be appropriate for their review, report and recommendation.