operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
 resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
 devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
 at downgradient locations to control sediment deposits to downstream surfaces.

 5.1.13 Fiber Roll
 Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
 established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
 into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
 NYSDEC specification for straw bale dike.

 Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
 facilitate effectiveness, daily inspections and inspections immediately after significant storm events
 will be performed by the Contractor(s) and maintenance will be performed as needed.

 5.2 Permanent Erosion and Sediment Control Measures

 The permanent erosion and sediment control measures described in the following sections are
 included as part of the construction documents.

 5.2.1  Establishment of Permanent Vegetation
 Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
 The type of seed, mulch, and maintenance measures as described in the contract documents shall
 also be followed.

 Permanent soil stabilization measures must be initiated by the end of the next business day and
 completed within fourteen (14) days from the date the soil disturbance activity has permanently
 ceased.

 Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
 and a uniform, perennial vegetative cover with a density of 80 percent has been established or
 equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
 all unpaved areas and areas not covered by permanent structures.

 5.2.2  Rock Outlet Protection
 Rock outlet protection shall be installed at the locations as indicated and detailed on the
 accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
 water, such that the flow will not erode downstream surfaces.

 5.3 Implementation Schedule for Erosion and Sediment Control Measures

 Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
 soil erosion and controlling off-site sediment transport during construction, as well as controlling the
 quality and quantity of stormwater runoff from the developed site after construction. The following
 table outlines the implementation schedule for initial placement of these measures, and the duration
 for which they should remain in place.

Stormwater Pollution Prevention Plan
  Page 17