Southtowns Record

PBA05.14.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
May 14, 2026, 6:00 p.m.
Posted by publisher
May 12, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Housing, Roads and traffic, Budget and taxes, Parks and recreation, Public safety

Original document

Same meeting

Text · page 162 of 359

Read the whole document on one page (all 359 pages, each with its own heading)

P=  1.00  inch
  Total Area  Existing Imperv  Proposed Imperv  Existing Disturbed  Imperv Reduction
  AREA
  (Acres)  (Acres)  (Acres)  Imperv Area (Acres)  (Acres)
  TO ALTERNATIVE PRACTICES  2.13  0.47  1.91  0.47  0%
  TO AREA REDUCTION SMPS
  SITE REMAINING AREA  3.55  0.59  1.07  0.35  0%
  TOTAL SITE  5.68  1.06  2.98  0.82  0%

Water Quality Volume Calculation
  Exist Disturbed Imperv  Imperv Area (NEW  Percent  TOTAL WQV
  Total Area  WQv  WQv Adjusted
  New Development / Redevelopment  WQv Treatment %  Area (REDEVELOPMENT)  DEVELOPMENT)  Impervious  Rv  REQUIRED  System Generated Notes
  (Acres)  (ft 3 )  (ft 3 )
  (Acres)  (Acres)  %  (ft 3 )
  REDEVELOPMENT ALTERNATIVE  75%  0.47  0.47  -  100%  0.95  1,621  1,216
  NEW DEVELOPMENT ALTERNATIVE  100%  1.66  -  1.44  87%  0.83  5,006  5,006
  8,672
  REDEVELOPMENT REMAINING AREA  25%  0.35  0.35  -  100%  0.95  1,207  302
  NEW DEVELOPMENT REMAINING AREA  100%  3.20  -  0.48  15%  0.19  2,149  2,149

Minimum Runoff Reduction Volume Calculation
  Total Impervious Area Added  Percent  MINIMUM RRv
  Weighted S
  AREA  (NEW DEVELOPMENT)  Soil Group A %  Soil Group B %  Soil Group C %  Soil Group D %  Impervious  Rv  REQUIRED  System Generated Notes
  Factor  3
  (Acres)  %  (ft )
  TOTAL SITE  1.92  0%  0%  0%  100%  100%  0.95  0.20  1,324

  Page 162 of 359