Southtowns Record

PBA05.14.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
May 14, 2026, 6:00 p.m.
Posted by publisher
May 12, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Housing, Roads and traffic, Budget and taxes, Parks and recreation, Public safety

Original document

Same meeting

Text · page 204 of 359

Read the whole document on one page (all 359 pages, each with its own heading)

E_App E_Post-Development Model  NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates  Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC  Page 7

  Summary for Subcatchment PS-2:

Runoff  =  3.74 cfs @ 12.04 hrs, Volume=  0.194 af, Depth= 1.40"
  Routed to Pond CH-1 : Chambers

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"

  Area (sf)  CN  Description
  64,081  98  Paved parking, HSG D
  8,235  80  >75% Grass cover, Good, HSG D
  72,316  96  Weighted Average
  8,235  11.39% Pervious Area
  64,081  88.61% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  6.0  Direct Entry, Direct

  Subcatchment PS-2:
  Hydrograph

  Runoff
  4  3.74 cfs
  NY-West Seneca 24-hr S1 1-yr
  Rainfall=1.82"
  3
  Runoff Area=72,316 sf
  Runoff Volume=0.194 af
  Runoff Depth=1.40"
  Flow (cfs)

  Tc=6.0 min
  2
  CN=96

  1

  0
  0  2 4  6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 204 of 359