BR Vegetation Examine all Bioretention cell vegetation. Problem (Check if Present) Follow-Up Actions The original plants are likely not suited for the actual conditions within the Bioretention cell . If you are knowledgeable about plants, select and plant more appropriate vegetation (preferably native plants) so that almost the entire surface area will be covered by the end of the second growing season. Other: Kick-Out to Level 2 Inspection: For all but small practices (e.g., rain gardens), this task will likely require a landscape design professional or horticulturalist. Vegetation is too thin, is not healthy, and there are many spots that are not well vegetated. BR Outlets Examine outlets that release water out of the Bioretention cell. Problem (Check if Present) Follow-Up Actions Add stone to reduce the impact from the water flowing out of the outlet pipe or weir during storms. Other: Erosion at outlet Kick-Out to Level 2 Inspection: Rills have formed and erosion problem becomes more severe. Remove the debris and dispose of it where it cannot re-enter the Bioretention cell . Other: Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed; there is too much material to remove by hand or with simple hand tools. Outlet obstructed with mulch, sediment, debris, trash, etc. Page 7 of 8 Page 292 of 359