1.0  EXECUTIVE SUMMARY
 This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
 with construction of a 75-unit affordable housing complex and related site work in the Town of West
 Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
 permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
 National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
 requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
 commencement of construction activity.

 This SWPPP has been developed in accordance with the “New York State Department of Environmental
 Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
 Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
 2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
 management, pollution prevention, and erosion and sediment control measures necessary during and
 following completion of construction.

 This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
 a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
 SWPPP is not considered complete without them. References made herein to “the plans” or to a
 specific “sheet” refer to these drawings.

 This report considers the impacts associated with the intended development with the purpose of:
  1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
  of upland watershed runoff;
  2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
  so as not to adversely alter downstream conditions; and
  3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
  resulting from stormwater runoff generated both during and after construction.

 The analysis and design completed and documented in this report is intended to be part of the
 application made for a multi-family residential redevelopment project with an increase in impervious
 area completed on behalf of the Owner/Operator.

 1.1 Project Description

 Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
 unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
 area of disturbance proposed is 5.7 acres. The project will disturb one (1) or more acres and as
 such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
 provided in Appendix A, as Figure A-1.

 This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
 located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
 post-construction stormwater management practices, as well as erosion and sediment controls.

 project is located within the Town Of West Seneca regulated, traditional land use control Municipal
 Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
 to accompany NOIs submitted to the NYSDEC.