2.0  SITE CHARACTERISTICS

 2.1 State Environmental Quality Review

 The construction activity is subject to State Environmental Quality Review (SEQR). The project is
 considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
 issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
 with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.

 2.2 Land Use and Topography

 The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
 subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.

 The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
 approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
 north and the west towards Cayuga Creek.

 2.3 Soils and Groundwater

 The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
 was used to obtain surficial soil conditions for the study area, as follows:

  Table 1: USDA Soil Data
  Depth to  Depth to
  Hydrologic  Erosion
  Map Symbol & Description  Water Table  Bedrock
  Soil Group  Factor K
  (feet)  (feet)
  Fu - Fluvaquents and Udifluvents, frequently
  A/D  0.17  0.50  >6.0
  flooded
  GaA - Galen very fine sandy loam, 0 to 3
  A/D  0.37  1.75  >6.0
  percent slopes
  GaB - Galen very fine sandy loam, 3 to 8
  A/D  0.37  1.75  >6.0
  percent slopes
  Te – Teel silt loam  B/D  0.37  1.75  >6.0

 Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
 slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
 soils with a soil slope phase of E or F.

 The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
 For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
 condition.

  Table 2: Project Site HSG Data
  HSG A  HSG B  HSG C  HSG D
  0%  0%  0%  100%

Stormwater Pollution Prevention Plan
  Page 3
2241067
  Page 90 of 359