2.13 Post-development Watershed Conditions

 The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
 and woods. The analysis of post-development conditions considered existing drainage patterns, soil
 types, ground cover to remain, planned site development, site grading, and stormwater management
 facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
 has been provided in Appendix A, as Figure A-6.

 The results of the computer modeling used to analyze the overall watershed under post-development
 conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
 at each Design Point is presented in Table 11.

 There are numerous locations and methods for providing controls of off-site discharge of stormwater
 from the project site. Each has been designed to provide the above quantity controls by attenuating
 stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
 existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
 Development Watershed Delineation Map, with the tributary areas to each stormwater management
 practice proposed, has been provided in Appendix A, as Figure A-6.

 2.14 Description of Design Points

 The study area consists of the 11.2 acre project site and 5.7 acre area of disturbance. The overall
 watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
 conditions at several locations throughout the study area. Each of these locations was defined as a
 Design Point (DP) in order to compare the effects resulting from stormwater management facilities
 proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
  •  Design Point 1: Off-site discharge to Cayuga Creek

 3.0  STORMWATER MANAGEMENT PLANNING
 Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
 stormwater management practices that must be implemented for both new development and
 redevelopment projects. This process is intended to develop a design that maintains pre-construction
 hydrologic conditions through the application of environmentally sound development principles, as
 well as treatment and control of runoff discharges from the site. The following sections outline the
 step-by-step process and how it has been applied to this project.

 The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
 post-development conditions, to maintain the pre-development rate of runoff in order to minimize
 impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
 exiting the site.

 The Design Manual provides both water quality and water quantity objectives to be met by projects
 requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
 peak runoff rates and improve the quality of runoff leaving the developed site.