Southtowns Record

Town Board agenda packet — July 13, 2026

Government
Town of Aurora
Board
Town Board
Meeting
Jul 13, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Public safety, Parks and recreation, Audits and oversight, Roads and traffic

Original document

Same meeting

Text · page 16 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

OA

  June 24, 2026

  To All Involved and Interested Agencies:
  Town of Aurora
  Erie County Department of Public Works
  Erie County Department of Health
  Erie County Water Authority
  NYS Department of Environmental Conservation
  NYS Department of Health
  NYS Department of Transportation
  NYS Environmental Facilities Corporation
  NYS Historic Preservation Office
  U.S. Army Corps of Engineers

  Re:  Notice of Intent to Establish Lead Agency
  Village of East Aurora Water System Improvements
  Village of East Aurora, New York

  Dear Interested and Involved Agencies:

  Pursuant to the State Environmental Quality Review Act (“SEQRA”) and 6 NYCRR 617.6(b)(3)(i), please be
  advised that the Village of East Aurora intends to establish itself as Lead Agency for the purposes of
  fulfilling the SEQRA requirements relative to the proposed Village of East Aurora Water System
  Improvements Project. The Project will be located in the Village of East Aurora and Town of Aurora, Erie
  County, New York.

  The Village of East Aurora owns and operates a public water distribution system that serves residents
  and businesses throughout the Village. Portions of the existing water system do not meet current New
  York State Department of Health (NYSDOH) standards and have reached the end of their useful life,
  resulting in operational and maintenance challenges. The Village is proposing water system
  improvements to address identified deficiencies, improve system reliability, and bring the system into
  compliance with current NYSDOH standards.

  The proposed project includes the following components:
  e  Approximately 37,000 linear feet of water main replacement with new 8-inch ductile iron water
  main
  Replacement of approximately 50 fire hydrants
  Replacement of approximately 70 gate valves
  Transfer of approximately 550 water services to the new water mains
  Rehabilitation of the existing water storage tanks located on Center Street and Castle Hill Road
  Replacement of the existing booster pump station on Elmwood Avenue with a new
  hydropneumatic system consisting of pumps, pressure tanks, controls, and associated
  appurtenances to improve system redundancy, water pressure, and fire flow capacity

  The experience to
  listen
  The power to
1738 Elmwood Avenue Suite 100, Buffalo, NY 14207 * Office: 315-457-5200 « Fax: 315-451-0052 « BartonandLoguidice.com  solve  ®eae