Full Environmental Assessment Form
Part I ~ Project and Setting
Instructions for Completing Part 1
Part J is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification,
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to
update or fully develop that information,
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the
answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach
additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part
| is accurate and complete.
A. Project and Applicant/Sponsor Information.
Name of Action or Project:
Village of East Aurora Water System improvements
Project Location (describe and attach a general location map):
Village of East Aurora and Town of Aurora, Erie County, New York
Brief Description of Proposed Action {include purpose or need):
The Village of East Aurora owns and operates a public water distributlon system that serves residents and businesses throughout the Village. Portions of the existing
water system do not meet current New York State Department of Health (NYSDOH) standards and have reached the end of their useful life, resulting in operational
and maintenance challenges. The proposed project consists of Improvements to bring the system into compiiance with current NYSDOH standards and address ident!-
fied deficiencies. Improvements Include replacement of approximately 37,000 linear feet of undersized water main with new 8-inch ductile iron water main, replace-
ment of approximately 50 hydrants and 70 gate valves, transfer of approximately 550 water services to the new mains, rehabilitation of the existing water storage
tanks on Center Street and Castle Hill Road, and replacement of the existing booster pump station on Elmwood Avenue with a new hydropneumatic system to im-
prove system redundancy, water pressure, and fire flow capacity. Construction will occur primarily within existing roadway rights-of-way and at existing utillty faclli-
tles.
Name of Applicant/Sponsor: Telephone: 746-388-1605
Village of East Aurora, C/O Luke Wochensky, Mayor E-Mail: [email protected]
Address: 95 Oakwood Avenue
City/PO: East Aurora, NY State: yy Zip Code:
Project Contact (if not same as sponsor; give name and title/role): Telephone: 595-325-7190 ext 2222
Hannah Buys, Environmental Scientist i, Barton & Loguidice, D,P.C. E-Mail: [email protected]
Address:
4738 Elmwood Avenue, Suile 100
City/PO: State: Zip Code:
Buffato NY 44207
Property Owner (if not same as sponsor): Telephone:
Proposed water main and hydrant replacements wil occur within existing municipal roads. Storage tanks and boasler pump *