Southtowns Record

Town Board agenda packet — July 13, 2026

Government
Town of Aurora
Board
Town Board
Meeting
Jul 13, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Public safety, Parks and recreation, Audits and oversight, Roads and traffic

Original document

Same meeting

Text · page 22 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

e, Will the proposed action be constructed in multiple phases?  [] Yes [Xi No
  i, If No, anticipated period of construction:  12_ months
 ii, Tf Yes:
  *  Total number of phases anticipated
  ¢  Anticipated commencement date of phase | (including demolition)  month  year
  «  Anticipated completion date of final phase  month  year
  e  Generally describe connections or relationships among phases, including any contingencies where progress of one phase
  maydetermine timing or duration of future phases:

f. Does the project include new residential uses?  [1] Yes [X] No
If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)
Initial Phase
At compietion
  ofall phases

g. Does the proposed action include new non-residential construction (including expansions)?  1 Yes (] No
If Yes,
  i. Total number of structures  _4 (replacement booster pump structure)
  ii, Dimensions (in feet) of largest proposed structure:  ?  height;  ©  width; and__7  length (approx.50sf)
 iii. Approximate extent of building space to be heated or cooled: _ twa space wil not be heated or cooled  square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any  [Ves KiNo
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
  i, Purpose of the impoundment:
 ii. (fa water impoundment, the principal source of the water:  [J Ground water [Surface water streams [] Other specify:

iif, Lf other than water, identify the type of impounded/contained liquids and their source.

 iv. Approximate size of the proposed impoundment.  Volume:  million gallons; surface area:  acres
  y, Dimensions of the proposed dam or impounding structure:  height;  length
 vi, Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):

D.2. Project Operations
a, Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?  [ ]¥es [X]No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
If Yes:
  i. What is the purpose of the excavation or dredging?
  ii, How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
  *  Volume (specify tons or cubic yards):
  ©  Over what duration of time?
 iti, Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.

  iy, Will there be onsite dewatering or processing of excavated materials?  [] Yes{_]No
  If yes, describe.

  y. What is the total area to be dredged or excavated?  acres
  vi, What is the maximum area to be worked at any one time?  acres
 vil. What would be the maximum depth of excavation or dredging?  feet
 viii. Will the excavation require blasting?  [Yes []No
 ix. Summarize site reclamation goals and plan:

  Page 4 of 15  FEAF 2026