Southtowns Record

Town Board agenda packet — July 13, 2026

Government
Town of Aurora
Board
Town Board
Meeting
Jul 13, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Public safety, Parks and recreation, Audits and oversight, Roads and traffic

Original document

Same meeting

Text · page 24 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

d, Will the proposed action generate liquid wastes?  F-1 Yes [JNo
If Yes:
  i, Total anticipated liquid waste generation per day:  gallons/day
  ii, Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
  approximate volumes or proportions of each):

 iti, Will the proposed action use any existing public wastewater treatment facilities?  Cl¥es (1INo
Uf Yes:
  e  Name of wastewater treatment plant to be used:
  Name of district:
  e  Does the existing wastewater treatment plant have capacity to serve the project?  Ll¥es [No
  e  Is the project site in the existing district?  (Yes [JNo
  e  Is expansion of the district needed?  [ves [No

  e  Do existing sewer lines serve the project site?  ["TYes [No
  e  Willa line extension within an existing district be necessary to serve the project?  [TYes  CJNo
  If Yes:
  « Describe extensions or capacity expansions proposed to serve this project:

 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?  [JYes  [JNo
  If Yes:
  «  Applicant/sponsor for new district:
  *  Date application submitted or anticipated:
  °  What is the receiving water for the wastewater discharge?
 y. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
  receiving water (name and classification if surface discharge or describe subsurface disposal plans):

 vi. Describe any plans or designs to capture, recycle or reuse liquid waste:

 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point  [x]Yes  [No
  sources (i.e, ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
  source (i.¢., sheet flow) during construction or post construction?
 If Yes:
  i, How much impervious surface will the project create in relation to total size of project parcel?
  Square feetor__9  _ acres (impervious su rface)  (replacement booster pump station building will be located al the existing booster pump station site, No
  a  40.8  .  :  .  nel Increase in impervious surface area is anUcipated)
  Square feet or_40.8 acres (parcel size)
  ii, Describe types of new point sources.
  construction
 iii. Where will the stormwater runoff be directed (i.¢. on-site stormwater management facility/structures, adjacent properties,
  groundwater, on-site surface water, or off-site surface waters)?
  Existing drainage features, Including roadside drainage and on-site surface waters

  «  Ifto surface waters, identify receiving water bodies or wetlands:
  Tannery Brook and tibs, East Branch Cazenovia Creek and tribs
  ¢  Will stormwater runoff flow to adjacent properties?  [Yes (_JNo
  iv, Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?  [JYes [X]No

  Page 6 of 15  FEAF 2026