Text · page 24 of 74
Read the whole document on one page (all 74 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
d, Will the proposed action generate liquid wastes? F-1 Yes [JNo If Yes: i, Total anticipated liquid waste generation per day: gallons/day ii, Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iti, Will the proposed action use any existing public wastewater treatment facilities? Cl¥es (1INo Uf Yes: e Name of wastewater treatment plant to be used: Name of district: e Does the existing wastewater treatment plant have capacity to serve the project? Ll¥es [No e Is the project site in the existing district? (Yes [JNo e Is expansion of the district needed? [ves [No e Do existing sewer lines serve the project site? ["TYes [No e Willa line extension within an existing district be necessary to serve the project? [TYes CJNo If Yes: « Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? [JYes [JNo If Yes: « Applicant/sponsor for new district: * Date application submitted or anticipated: ° What is the receiving water for the wastewater discharge? y. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point [x]Yes [No sources (i.e, ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.¢., sheet flow) during construction or post construction? If Yes: i, How much impervious surface will the project create in relation to total size of project parcel? Square feetor__9 _ acres (impervious su rface) (replacement booster pump station building will be located al the existing booster pump station site, No a 40.8 . : . nel Increase in impervious surface area is anUcipated) Square feet or_40.8 acres (parcel size) ii, Describe types of new point sources. construction iii. Where will the stormwater runoff be directed (i.¢. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? Existing drainage features, Including roadside drainage and on-site surface waters « Ifto surface waters, identify receiving water bodies or wetlands: Tannery Brook and tibs, East Branch Cazenovia Creek and tribs ¢ Will stormwater runoff flow to adjacent properties? [Yes (_JNo iv, Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? [JYes [X]No Page 6 of 15 FEAF 2026