Text · page 29 of 74
Read the whole document on one page (all 74 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
¢. Is the project site presently used by members of the community for public recreation? X} Yes _]No
i If Yes: explain; Streams within the project area may be used for fishing.
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes [_JNo
day care centers, or group homes) within [500 feet of the project site?
if Yes,
i, Identify facilities:
East Aurora Union Free District School, East Aurora Pre School Center, Duck Duck Goose Child Care Center, Absolut Care of Aurora Park, and
First Presbyterian Preschool are within 1500 feet of the project site
e. Does the project site contain an existing dam? , [1 Yes {xX]No
If Yes:
i, Dimensions of the dam and impoundment:
« Datn height: feet
e Dam length: feet
e Surface area: acres
¢ Volume impounded: gallons OR acre-feet
ii. Dam’s existing hazard classification:
iii, Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, L] Yes [X]No
or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed? LC] Yes FINo
e If Yes, cite sources/documentation:
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
ifi. Describe any development constraints due to the prior solid waste activities:
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin CJ Yes EXINo
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i, Déseribe waste(s) handled and waste management activities, including approximate time when activities occurred:
h, Potential contamination history. Has there been a reported spill at the proposed project site, or have any Kj Yes L] No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site KX] Yes (] No
Remediation database? Check all that apply:
Yes — Spills Incidents database Provide DEC ID number(s); _ 2508380, 2504674
[] Yes— Environmental Site Remediation database Provide DEC ID number(s):
[] Neither database
ii. If site has been subject of RCRA corrective activities, describe contro! measures:
iii, Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? Yes LINo
If Yes, provide DEC ID number(s): _ 945157
iv. If Yes to (i), (i) or Git) above, describe current status of site(s):
All spill records have been closed out. Remediation at the sile has been completed,
Page II of 15 FEAF 2026