Southtowns Record

Town Board agenda packet — October 21, 2026

Government
Town of Orchard Park
Board
Town Board
Meeting
Oct 21, 2026
Kind
Agenda packet
Topics
Budget and taxes, Zoning and land use, Roads and traffic, Water, sewer and drainage, Parks and recreation

Original document

Same meeting

Text · page 15 of 19

Read the whole document on one page (all 19 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

NO" I]
  Planning Department  —  Site  Plan  &  Building  Permit  for  2783
  Southwestern Blvd.

  RESOLVED, that the Town Board does hereby approve the following resolution upon the recommendation of
  the Planning Board from their October 8, 2026 meeting:

  RESOLVED, with regard to PB File #12-26, 2783 Southwestern Boulevard, (Route 20 Ice Cream), located on
  the south side of Southwestern Boulevard, west of Angle Road, Zoned B-2, SBL #153.07-1-3, The Town Board
  approves the presented Site Plan, received 09/25/26 and authorize a Building Permit for the parking lot expansion
  of 31 parking spaces, located west of the existing development, based on the following conditions and stipulations:

  All public notices have been filed.
2.  This is an Unlisted Action, based on the Short EAF  submitted 9/22/26, and a Negative Declaration is
  recommended.

3.  No Site lighting is proposed. Should site lighting be added in the future, the Applicant is directed to return
  to the Planning Board.
4.  No outside storage or display is permitted.
  Any future dumpsters shall be screened, in accordance with Section 144-25 of the Town Code.
6.  The Applicant is to provide the Town of Orchard Park Assessor with an “independent” appraisal for the
  completed project (meaning all completed phases) by a Certified Commercial Appraiser.
7.  A GML 239n referral was submitted to the ECDEP  on 9/22/26. Comments were received on 9/30/26. No
  recommendation was made.

8.  The Site Plan dated 09/25/26 has been determined by the Building Inspector to be Compliant as presented.
9.  Engineering Approval was granted on 10/6/26.