Text · page 19 of 19
Read the whole document on one page (all 19 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF ORCHARD PARK BUILDING INSPECTOR MONTHLY REPORT MONTH OF SEPTEMBER 2026 BUILDING PERMITS # OF VALUE BUILDING PERMITS # OF VALUE NEW CONSTRUCTION: ABOVE GROUND POOLS SINGLE DWELLING 7 3,213,900 INGROUND POOLS 4 274,200 DOUBLE DWELLING DECKS 3 77,867 APT/MULTI-FAMILY ELECTRICAL 6 14,324 COMMERCIAL 3 2,330,000 FENCES 9 90,260 ADDITIONS: GARAGE/ BARN / POLE BARN 3 167,940 RESIDENTIAL 3 187,000 GENERATORS 14 185,148 COMMERCIAL ' MISC. (OPERATING/ DEMO) 3 300 ALTER/REPAIR: 4 144,599 PORCH/PATIO 7 162,950 RESIDENTIAL SHEDS 17 181,043 COMMERCIAL / TENANT BO 1 60,000 SIGNS 5 51,150 COMMERCIAL MISC. 2 319,440 RESIDENTIAL MISC. 16 278,536 SOLAR PV SYSTEM 6 125,901. TOTAL: 113 7,864,558 INSPECTIONS NUMBER OF INSPECTIONS PER ZONE TOTAL TYPE: 1 2 3 4 NEW CONSTRUCTION: RESIDENTIAL 17 3 3 23 COMMERCIAL 3 2 13 18 ADDITIONS: RESIDENTIAL 3 3 4 1 11 COMMERCIAL 4 4 ALTER/REPAIR: RESIDENTIAL 4 5 6 1 16 COMMERCIAL / TENANT BO 1 6 4 11 ABOVE GROUND POOLS INGROUND POOLS 1 1 2 DECKS 5 2 3 3 13 ELECTRICAL 1 1 FENCES 1 1 GARAGE/BARN/POLE BARN 6 2 1 2 11 GENERATORS 2 2 4 MISC. 5 4 5 13 27 PROPERTY MAINTANICE 7 14 6 43 70 SHEDS 1 1 SIGNS SOLAR PV SYSTEM 1 1 FIRE INSPECTIONS 7 6 15 28 CLOSEOUT INSPECTIONS 1 1 TOTAL INSPECTIONS: 52 46 46 99 243 Meetings Attended Town Board Planning Board ZBA Court Tom Minor 2 2 1 Jacob Klahn 1 2 Natalie Nawrocki 1 Paul Tatkop 1 ZONING BOARD OF APPEALS: GRANTED: _. DENIED: A TABLED: } REMARKS: SIGNATURE: we “AU rt DATE: lof> 202 F/TOWN/BLOGINSP7MONTHLYREPORK2023