Text · page 14 of 15
Read the whole document on one page (all 15 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
This is an Unlisted Action, based on the Short EAF submitted 5/28/26, and a Negative Declaration is made. The site lighting is limited to those fixtures and poles indicated on the approved Site Plan. Light fixtures shall have flat lenses and all lighting is to be directed downward and toward the site. No outside storage or display is permitted. Any future dumpsters shall be screened, in accordance with Section 144-25 of the Town Code. The Landscaping Value Estimate of $21,615.00 requires a Certified Check amounting to 50% of the total shall be deposited with the Town Clerk prior to receiving a Building Permit ($10,807.50). The Applicant is to provide the Town of Orchard Park Assessor with an “independent” appraisal for the completed project by a Certified Commercial Appraiser. A GML 239n referral was submitted to the ECDEP on 5/28/26. Comments were received on 6/1/26. No recommendation was made. The Site Plan dated 06/10/26 has been determined by the Building Inspector to be Compliant as presented. 10. Town Engineering approval was granted on 6/11/26.