Text · page 10 of 57
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
ENGINEERING DEPARTMENT S$ 4295 South Buffalo Street Orchard Park, New York 14127-2609 Phone: (716) 662-6425 TOWN ENGINEER Email: [email protected] WAYNE L. BIELER, PE., CFM July 10, 2026 Honorable Town Board Town of Orchard Park 4295 South Buffalo Street Orchard Park, New York 14127 Re: Webster Road 3 Sublot Subdivision; Rear Yard Drainage PIP #2026-02 Dear Board Members: We have received, from Andrew Romanowski, Maple Grove Holdings, LLC, 4747 Camp Road, Hamburg, New York 14075, an application for a Public Improvement Permit to construct rear yard drainage for the Webster Road 3 Sublot Subdivision. The project consists of the installation of 392 L.F. of public rear yard drainage to serve 3 residential sublots’ location as shown on the attached location map. | have reviewed the plans for the proposed project and have found them to be in compliance with current Town Specifications and Standards. We are in receipt of all necessary fees, bond, and insurances. |, therefore, recommend approval of the amended Public Improvement Permit #2026-02 for the rear yard drainage for the Webster Road 3 Sublot Subdivision. d, <7 / / Respectfully submitte ae . Bieler, P.E., CFM Town Engineer Attachments: Application for PIP #2026-02 Ce: William Even, Town Clerk Timothy Gallagher, Town Attorney Nancy Kenton, Town Assessor Andy Slotman, Highway Superintendent File #25.014 S:\Subdivisions\Webster Road 3 Sublot Brandon Block Subdivision\PIP Construction\PIP APPROVAL - Webster 3Lot Rear Yard Drainage.doc Visit the Town’s website at www.orcharcloarkny.gov