Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 456 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

32 LF 6" HDPE ROOF  OE  YD 3
  LEADER @ 1.0%  HDPE @ 1.0%  OE
  BIORETENTION AREA #1

  UE
  OE  RIM 684.00
  2,855 S.F.  CB 4  PP

  OE
  INV 681.09
  (2,850 S.F. REQUIRED)  C.O.  RIM 679.90
  TOP ELEV = 673.50  C.O.  INV 675.57

  UE
  YD 12-15 (TYP.)
  RIM 673.50  30 LF 6" PERF.
  BOTTOM ELEV = 673.00
  131 LF 12"  STOP

  OE
  INV 669.67  HDPE @ 0.0%  121 LF 12"  STM MH 1  HDPE @ 1.0%
  HDPE @ 1.0%  RIM 679.20
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.

  UE
  INV 675.74 N  12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  31 LF 6"  A

  Greensboro
  48 LF 6" HDPE ROOF  INV 674.21 SW, E
  RE

  OE
  HDPE @ 0.3%  EX. PIPE TO DISCHARGE
  LEADER @ 1.0%  DIRECTLY TO CB 12  . A
  BIT
  UE

  17 LF 8"
  HDPE @ 0.5%
  674
  675  12"  170°-37'-13"

  OE
  673
  25 LF 8"  672  12"x6" TEE  APPROX. LOCATION  CONTRACTOR TO VERIFY LIMITS OF  CB 12
  671  RIM 682.90
  HDPE @ 0.5%  670  INV 673.58  OF CEMETERY  CEMETERY AND NOTIFY DESIGN
  UE

  END SECTION  ENGINEER OF ANY POTENTIAL CONFLICTS  INV 679.28
  END SECTION  END SECTION  HEAD STONES NOT
  INV 668.80  INV 673.00
  INV 669.00

  Utica
  673  LOCATED  127°-49'-44"
  END SECTION
  UE

  673  YD 16-18 (TYP.)
  INV 669.57  RIM 673.50  14"
  INV 669.67  28"
  14"

  Buffalo
  UE

  END SECTION
  OUTLET  INV 673.00  W. INV: 682.97
  STRUCTURE  355 LF 12" HDPE @ 1.0%
  RIM 674.80  EX. STORM SEWER TO BE  (12" HDPE)
  12" E-W INV 675.41
  INV 668.93  RE-ROUTED.
  UE

  END SECTION  48 LF 12"  12" NW-SE INV 673.40
  INV 669.57  HDPE @ 1.1%  73 LF 12" HDPE @ 1.0%
  EX. STORM SEWER TO BE
  31 LF 6"  RE-ROUTED.
  UE

  10' WIDE EMERGENCY  HDPE @ 0.3%
  SPILLWAY ELEV. 674.80  TOP OF  CB 10  STM MH 2
  LINE WITH LIGHT STONE FILL  POND 675.30  BIORETENTION AREA #2  END SECTION  PARKING
  1,700 S.F.  CB 11  12"x6" TEE  123 LF 12"  RIM 679.50  RIM 683.00
  RIP RAP FLUSH WITH SPILLWAY  INV 675.00  RIM 678.00  INV 675.98  HDPE @ 1.1%  INV 676.83  INV 678.55
  (1,620 S.F. REQUIRED)  LOT
  UE

  TOP ELEV = 673.50  INV 675.48 E
  BOTTOM ELEV = 673.00  INV 673.53 NW
  UE

  20 LF 6" PERF.  40 LF 6" HDPE ROOF  STOP

  Multifamily Development
  HDPE @ 0.0%  LEADER @ 1.0%  C.O.  C.O.  C.O.  C.O.
  146°-28'-21"
  PART OF
  L-11442, P-836
  UE

  CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
  UE

  DRAIN @ 1.0%. COORDINATE DOWNSPOUT
  LOCATIONS WITH ARCHITECTURAL PLANS.
  UE

  YD 8
  UE

  209 LF 12"

  1425 & 1475 Orchard Park Rd
  BUILDING W/ATTACHED GARAGES
  HDPE @ 0.8%  RIM 681.90
  INV 679.80

  PROPOSED 1-STORY 6 UNIT

  BUILDING W/ATTACHED GARAGES
  149°-26'-50"

  PROPOSED 1-STORY 6 UNIT
  UE

  F.F.E. = 682.80

  F.F.E. = 682.80
  63 LF 8"
  CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER  HDPE @ 0.5%  PARKING
  DRAIN @ 1.0%. COORDINATE DOWNSPOUT
  UE

  LOT
  © CARMINA WOOD DESIGN

  LOCATIONS WITH ARCHITECTURAL PLANS.

  West Seneca, NY
  UE

  YD 9
  SCRUB SHRUB WETLANDS (PSS)  RIM 681.90
  (APPROXIMATE LOCATION)  INV 679.48  153°-18'-56"
  UE

  32 LF 6" HDPE ROOF
  CB 9  LEADER @ 1.0%  8"
  RIM 681.00
  UE

  73 LF 8"
  INV 678.50  HDPE @ 0.5%
  UE

  36 LF 8"

  Date
  C.O.  C.O.  HDPE @ 0.5%  C.O.
  UE

  C.O.
  32 LF 6" HDPE ROOF  YD 11
  LEADER @ 1.0%  RIM 681.70  YD 10
  INV 678.68  85 LF 8"  RIM 681.90
  UE

  HDPE @ 0.5%  INV 679.11
  UE

  No. Description
  12"

  REVISIONS:
  8"  11"
  6" 8"  12"
  7"
  6"
  6"  6"  12"
  13"
  6"

  133°-32'-58"

  STORMWATER RUNOFF SUMMARY  PROPOSED UTILITY LEGEND

  Drainage Plan - South  TO DETENTION:

  EVENT  PROP. RUNOFF (CFS) ELEVATION (FEET)  STORAGE (CF)
  PROPOSED STORM SEWER  ST

  1-YEAR  1.94  671.04  5,335  PROPOSED SANITARY SEWER  6" SA  DRAWING NAME:
  SCALE: 1"=30'  10-YEAR  2.82  672.95  15,013
  25-YEAR  3.10  673.70  21,268
  PROPOSED WATERLINE  1" W
  Drainage
  100-YEAR  3.45  674.73  34,966

  DIRECT:
  Plan - South
  PROPOSED CATCH BASIN  CB
  EVENT  PROP. RUNOFF (CFS)
  1-YEAR  0.38
  10-YEAR  1.12  PROPOSED YARD DRAIN  YD
  25-YEAR  1.57  Date:  5/22/26
  100-YEAR  2.52
  Drawn By:  A. Pandolfe
  PROPOSED MANHOLE  MH
  TOTAL SITE:  Scale:  As Noted
  DRAWING NO.
  EVENT  EX. RUNOFF (CFS)  PROP. RUNOFF (CFS)  PROPOSED HYDRANT ASSEMBLY
  1-YEAR  2.63  2.32
  10-YEAR
  25-YEAR
  100-YEAR
  8.17
  11.66
  18.97
  3.94
  4.67
  5.97
  PROPOSED GATE VALVE  GV
  NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
  3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.

  30  0  30  60Ft.
  C-302
  Project No:  23-4121
  COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE  30'
  BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
  Page 456 of 849