Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 468 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 1 of 4
5/26/2026

Section 1 – Location & Description

This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the development.

See Appendix A for Site Location Map.

Section 2 – Water System

The proposed 6” combined water service will connect to an existing 8” PVC water main located on the west
side of Orchard Park Road. The proposed service will tap the main and enter a heated enclosure where an
RPZ and meter will be provided. The combined service will enter the buildings and reduce to a 2” domestic
service. Two (2) private fire hydrants are proposed to provide fire protection. Drainage from the hotbox
due to testing or failure will be via gravity to the nearest drainage inlet. Water inside the building will be
used for typical bathroom and janitorial uses.

Domestic Summary:
  Peak Operating Demand:  87 gpm
  Water Main:  8” PVC water main along Orchard Park Road
  Static Pressure:  70 psi
  Friction Loss:  0.2 psi
  Elevation Loss:  -2.0 psi
  Meter & RPZ Loss:  13 psi
  Pressure at furthest unit:  58.8 psi

Fire Summary:
  Peak Operating Demand:  1,000 gpm
  Water Main:  8” PVC water main along Orchard Park Road
  Static Pressure:  70 psi
  Friction Loss:  12.6 psi
  Elevation Loss:  -2.0 psi
  Meter & RPZ Loss:  13 psi
  Pressure at furthest hydrant:  46.4 psi

Repairs to all devices will be made during off hours; dual backflow preventers are not required. The site is
not located in a 100-year flood plain.

Disinfection of the water service following installation will be continuous feed, according to AWWA C-651,
latest revision.

See Appendix B for Sanitary Sewer & Water Calculations.

Section 3 – Sanitary Sewer Service

The proposed sanitary sewer service will connect to an existing manhole located along the west side of
Orchard Park Road. The proposed service will consist of approximately 691 LF of 8” SDR-35 PVC private
sanitary sewer main at a slope of 0.4%, 346 LF of 6” SDR-35 PVC sanitary sewer lateral at a minimum slope
of 1.0% and 285 LF of 3” SDR-21 PVC force main with a minimum cover of 4’.

  Page 468 of 849