Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 2 of 4
5/26/2026

  Design Parameters:
  Multifamily Development: 29 units x 220 gpd/unit = 6,380 gpd

Since the sanitary sewer extension is designed to convey greater than 2,500 gpd, a downstream sewer
capacity analysis was performed to ensure that the existing sewer could handle the additional flow.

The hydraulic loading rates per “Design Standard for Wastewater Treatment Works” 2014, NYSDEC.

See Appendix B for Sanitary Sewer & Water Calculations

See Appendix C for Downstream Sewer Capacity Analysis Report

Section 4 – Storm Sewer Service

The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.

The proposed development will replicate the existing hydrology of the site. The proposed hydrology for the
development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and yard
drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled rate,
to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.

Design Criteria
Storm pipes:  10-year storm
Detention:  Comparison of the existing 1-year vs. the proposed 1-year runoff.
  Comparison of the existing 10-year vs. the proposed 10-year runoff.
  Comparison of the existing 10-year vs. the proposed 25-year runoff.
  Comparison of the existing 100-year vs. the proposed 100-year runoff.

Stormwater Runoff Summary:

To Detention:
  Event  Prop. Runoff (cfs)  Elevation (ft)  Storage (cf)
  1-yr  1.94  671.04  5,335
  10-yr  2.82  672.95  15,013
  25-yr  3.10  673.70  21,268
  100-yr  3.45  674.73  34,966

Direct:
  Event  Prop. Runoff (cfs)
  1-yr  0.38
  10-yr  1.12
  25-yr  1.57
  100-yr  2.52

Total Site:
  Event  Ex. Runoff (cfs)  Prop. Runoff (cfs)
  1-yr  2.63  2.32
  10-yr  8.17  3.94
  25-yr  11.66  4.67
  100-yr  18.97  5.97