TECsmith TECSMITH, Inc. PO Box 95 Clarence, NY 14031 Tel: 716-462-0382 Date: September 15, 2022 SANITARY SEWER FLOW CAPACITY STUDY – Summary Review Prepared For: 1130 Orchard Park Road Capacity Analysis R. Christopher Wood, PE Partner 487 Main Street, Suite 500 Buffalo, New York 14203 Project Name: 1130 Orchard Park Road Capacity Analysis Flow Monitoring Period: August 16, 2022 to September 14, 2022 Rain Events (> 0.5-inches) Monitored: August 30 (0.97”), and September 5 (0.72”) Number of Monitoring Nodes: Two (2) downstream manholes Node Locations and Descriptions: • Node 1 1001 Orchard Park Rd (12”) • Node 2 Orchard Park Rd 15" (15”) Summary Conclusion: Based on the data presented in this report, specifically the flow depth measurements recorded (see graphs below) • One time the flow depth exceeds pipe diameter at all nodes of the downstream monitoring points during the wet weather events monitored. water and wastewater monitoring specialists Page 491 of 849