Text · page 588 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
3. The project manager and the Engineer of Record will be notified immediately. Spills of toxic or hazardous materials will be reported to the appropriate federal, state, and/or local government agency, regardless of the size of the spill. Spills of amounts that exceed Reportable Quantities of certain substances specifically mentioned in federal regulations (40 CFR 110, 40 CFR 117, and 40 CFR 302) must be immediately reported to the EPA National Response Center, telephone 1-100-424-1102. From SWPPP- 9 “Reportable Quantity Release Form” must be filled out. 4. If the spill exceeds a Reportable Quantity, the SWPPP must be modified within seven (7) calendar days of knowledge of the discharge to provide a description of the release, the circumstances leading to the release, and the date of the release. The plans must identify measures to prevent the recurrence of such releases and to respond to such releases. C. The job site superintendent will be the spill prevention and response coordinator. He will designate the individuals who will receive spill prevention and response training. These individuals will each become responsible for a particular phase of prevention and response. The names of these personnel will be posted in the material storage area and in the office trailer onsite. 119 CONTROL OF NON-STORM WATER DISCHARGES Certain types of discharges are allowable under the NYSDEC SPDES General Permit for Construction Activity for the State of New York, and it is the intent of this SWPPP to allow such discharges. These types of discharges will be allowed under the conditions that no pollutants will be allowed to come in contact with the water prior to or after its discharge. The control measures which have been outlined previously in this SWPPP will be strictly followed to ensure that no contamination of these non-storm water discharges takes place. The following allowable non-storm water discharges which may occur at the job site include: A. Discharges from firefighting activities. B. Fire hydrant flushings (see note below) C. Waters used to wash vehicles or control dust in order to minimize offsite sediment tracking. D. Routine external building washdown which does not use detergents. E. Pavement wash waters where spills or leaks of hazardous materials have not occurred or detergents have not been used. F. Air conditioning condensate. G. Springs or other uncontaminated groundwater, including dewatering ground water infiltration. H. Foundation or footing drains where no contamination with process materials such as solvents is present. Note: The Contractor shall discharge any super-chlorinated water from water distribution pipe disinfection activities into sanitary sewer system Multifamily Development 5/26/26 Page 22 of 23 Page 588 of 849