Text · page 589 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
120 STORM WATER CONTROL FACILITY MAINTENANCE The frequency of inspections for the bioretention areas shall match the frequencies listed on the “Bioretention Operation, Maintenance and Management Inspection Checklist” in Appendix L of the SWPPP. The proposed catch basins, as per section 115, shall be inspected 4 times per year for removal of floatable debris. Any silt buildup over 6” in depth shall be removed and disposed of properly off-site. Multifamily Development 5/26/26 Page 23 of 23 Page 589 of 849