Text · page 718 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
Part I.D.2.b.i.2. 2. the Owner/Operator Certification Form, Appendix J, signed by the owner or operator; and ii. if an eNOI includes construction activities within the municipal boundary(ies) of Traditional Land Use Control MS4 Operator(s) that will discharge to the MS4(s): 1. determine if the Traditional Land Use Control MS4 Operator(s) have review authority. A Traditional Land Use Control MS4 Operator does not have review authority where: a. the owner or operator of the construction activities in Part I.D.2.b.ii. is the same entity as the Traditional Land Use Control MS4 Operator identified in Part I.D.2.b.ii.; or b. there is a statute exempting the owner or operator from zoning review by the Traditional Land Use Control MS4 Operator; or c. there is no such statute per Part I.D.2.b.ii.1.b., the Traditional Land Use Control MS4 Operator concludes, after public hearing, that it does not have zoning review authority in accordance with Legal Memorandum LU14 Updated January 2020 “Governmental Immunity from Zoning and Other Legislation”; and 2. if the Traditional Land Use Control MS4 Operator(s) have review authority, submit the SWPPP to the Traditional Land Use Control MS4 Operator(s) for review and have: a. if outside the municipal boundaries of NYC: the MS4 SWPPP Acceptance Form, Appendix G, signed by the principal executive officer or ranking elected official from the Traditional Land Use Control MS4 Operator, or by a duly authorized representative of that person in accordance with Part VII.J.2.; or 12 Page 718 of 849