Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 719 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Part I.D.2.b.ii.2.b.
  b. if within the municipal boundaries of NYC: The
  City of New York Department of Environmental
  Protection (NYCDEP) SWPPP
  Acceptance/Approval Form, Appendix H, signed
  by the principal executive officer or ranking elected
  official from the Traditional Land Use Control MS4
  Operator, or by a duly authorized representative of
  that person in accordance with Part VII.J.2.; and

  3. if the Traditional Land Use Control MS4 Operator does
  not have review authority, have the MS4 No Jurisdiction
  Form, Appendix I, signed by the principal executive
  officer or ranking elected official from the Traditional Land
  Use Control MS4 Operator, or by a duly authorized
  representative of that person in accordance with Part
  VII.J.2.

  3. Submitting an eNOI:

  a. The owner or operator must submit a complete Notice of Intent
  electronically using a NYSDEC approved form. 2

  b. The owner or operator is authorized to commence construction activity
  as of the authorization date indicated in the Letter of Authorization
  (LOA), which is sent by NYSDEC after a complete eNOI is submitted.

  i. If an eNOI is received for a SWPPP that deviates from one of
  the technical standards but demonstrates equivalence in
  accordance with Part III.B.1.a.ii. or Part III.B.2.b.ii., if the
  SWPPP includes construction activities that are not within the
  municipal boundary(ies) of Traditional Land Use Control MS4
  Operator(s), and/or if the SWPPP includes construction
  activities within the municipal boundary(ies) of Traditional Land
  Use Control MS4 Operator(s) that do not have review authority
  in accordance with Part I.D.2.b.ii.1., the authorization date
  indicated in the LOA will be 60 business days after the eNOI
  submission date.

2 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must

be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
  13

  Page 719 of 849