Part I.E.6.a.i. i. NYSDEC’s Regional Office Division of Water staff based on the project location, Appendix E, if a Traditional Land Use Control MS4 Operator does not have review authority in accordance with Part I.D.2.b.ii.1.; or ii. the Traditional Land Use Control MS4 Operator, if a Traditional Land Use Control MS4 Operator has review authority in accordance with Part I.D.2.b.ii.1.; or iii. NYSDEC’s Regional Office Division of Water staff based on the project location, Appendix E, and each involved Traditional Land Use Control MS4 Operator, if the project spans multiple municipalities with more than one Traditional Land Use Control MS4 Operator involved with review authority in accordance with Part I.D.2.b.ii.1. b. The written Request to Disturb Greater Than Five Acres must include: i. The SPDES permit identification number (Permit ID); and ii. Full technical justification demonstrating why alternative methods of construction that would result in five acres of soil disturbance or less at any one time are not feasible; and iii. The phasing plan for the project and sequencing plans for all phases from the SWPPP in accordance with Part III.B.1.d.; and iv. Plans with locations and details of erosion and sediment control practices such that the heightened concern for erosion when disturbing greater than five acres at one time has been addressed; and v. Acknowledgment that “the owner or operator will comply with the requirements in Part IV.C.2.b.”; and vi. Acknowledgment that “the owner or operator will comply with the requirements in Part II.B.1.b.” c. The owner or operator must be in receipt of an Authorization Letter to Disturb Greater Than Five Acres, which will include when the 16 Page 722 of 849