Part I.E.6.c.
  authorization begins and ends and indicate a maximum area (acres) of
  soil disturbance allowed at any one time, from:

  i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or

  ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii.
  applies.

  7. Upon a finding of significant non-compliance with the practices described in
  the SWPPP or violation of this permit, NYSDEC may order an immediate stop
  to all construction activity at the site until the non-compliance is remedied.
  The stop work order must be in writing, describe the non-compliance in detail,
  and be sent to the owner or operator.

  8. If any human remains or archaeological remains are encountered during
  excavation, the owner or operator must immediately cease, or cause to
  cease, all construction activity in the area of the remains and notify the
  appropriate Regional Water Engineer (RWE). 3 Construction activity shall not
  resume until written permission to do so has been received from the RWE.

  9. To be authorized to implement modifications to the information previously
  submitted in the eNOI, the owner or operator must:

  a. notify NYSDEC via email at [email protected] requesting
  access to update the eNOI; and

  b. update the eNOI to reflect the modifications and resubmit the eNOI in
  accordance with Part I.D.; and

  c. receive an updated LOA.

  10. The eNOI, SWPPP, LOA, updated LOAs (when applicable), and inspection
  reports required by this permit are public documents that the owner or
  operator must make available for review and copying by any person within
  five business days of the owner or operator receiving a written request by any
  such person to review these documents. Copying of documents will be done
  at the requester’s expense.

3 The Regional Water Manager where a DEC Region does not have a RWE.