Part I.E.6.c. authorization begins and ends and indicate a maximum area (acres) of soil disturbance allowed at any one time, from: i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii. applies. 7. Upon a finding of significant non-compliance with the practices described in the SWPPP or violation of this permit, NYSDEC may order an immediate stop to all construction activity at the site until the non-compliance is remedied. The stop work order must be in writing, describe the non-compliance in detail, and be sent to the owner or operator. 8. If any human remains or archaeological remains are encountered during excavation, the owner or operator must immediately cease, or cause to cease, all construction activity in the area of the remains and notify the appropriate Regional Water Engineer (RWE). 3 Construction activity shall not resume until written permission to do so has been received from the RWE. 9. To be authorized to implement modifications to the information previously submitted in the eNOI, the owner or operator must: a. notify NYSDEC via email at [email protected] requesting access to update the eNOI; and b. update the eNOI to reflect the modifications and resubmit the eNOI in accordance with Part I.D.; and c. receive an updated LOA. 10. The eNOI, SWPPP, LOA, updated LOAs (when applicable), and inspection reports required by this permit are public documents that the owner or operator must make available for review and copying by any person within five business days of the owner or operator receiving a written request by any such person to review these documents. Copying of documents will be done at the requester’s expense. 3 The Regional Water Manager where a DEC Region does not have a RWE. 17 Page 723 of 849