Part I.F.
  F. Permit Coverage for Discharges Authorized Under GP-0-20-001

  When applicable:

  1. Upon the effective date of this permit, an owner or operator of a construction
  activity, with coverage under GP-0-20-001, will have interim coverage under
  GP-0-25-001 for 45 calendar days starting on the effective date of GP-0-25-
  001 so long as the owner or operator maintains compliance with all applicable
  requirements of this permit.

  2. Within 30 calendar days of the effective date of this permit, the owner or
  operator, with coverage under GP-0-20-001, must submit a complete Request
  to Continue Coverage electronically using a NYSDEC approved form, 4 which
  contains the information identified in Part I.F.3. below, if:

  a. the owner or operator continues to implement the SMP component in
  conformance with the technical standards in place at the time of initial
  project authorization; and

  b. the owner or operator will comply with all non-design requirements of GP-
  0-25-001.

  3. The Request to Continue Coverage form contains questions to: ensure
  eligibility requirements in Part I.A. have been met; verify owner or operator
  contact information; verify the permit identification number; verify the original
  eNOI submission ID, if applicable; verify Part I.F.2.a. and b.; verify the version
  of the Design Manual that the technical/design components conform to; and
  receive an updated Owner/Operator Certification Form, Appendix I.

  4. The owner or operator has obtained continued coverage under GP-0-25-001
  as of the date indicated in the LOCC, which is sent by NYSDEC after a
  complete Request to Continue Coverage form is submitted.

  5. If the owner or operator does not submit the Request to Continue Coverage
  form in accordance with Part I.F.2. and 3., coverage under this permit is
  automatically terminated after interim coverage expires.

4 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must

be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.