Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 726 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Part II.
Part II. Water Quality-Based Effluent Limitations

  A. Maintaining Water Quality

  NYSDEC expects that compliance with the requirements of this permit will control
  discharges necessary to meet applicable water quality standards. It shall be a
  violation of the ECL for any discharge to either cause or contribute to a violation
  of the following water quality standards as contained in Parts 700 through 705 of
  Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of
  New York:
  1. There must be no increase in turbidity that will cause a substantial visible
  contrast to natural conditions; and

  2. There must be no increase in suspended, colloidal or settleable solids that will
  cause deposition or impair the waters for their best usages; and

  3. There must be no residue from oil and floating substances, nor visible oil film,
  nor globules of grease.

  If there is evidence indicating that the stormwater discharges authorized by this
  permit are causing, have the reasonable potential to cause, or are contributing to
  a violation of the water quality standard, the owner or operator must take
  appropriate corrective action in accordance with Part IV.C.5. of this permit and
  document in accordance with Part IV.C.4. of this permit. To address the water
  quality standard violation the owner or operator must include and implement
  appropriate controls in the SWPPP to correct the problem or obtain an individual
  SPDES permit.

  If, despite compliance with the requirements of this permit, it is demonstrated that
  the stormwater discharges authorized by this permit are causing or contributing
  to a violation of water quality standards, or if NYSDEC determines that a
  modification of this permit is necessary to prevent a violation of water quality
  standards, the authorized discharges will no longer be eligible for coverage under
  this permit, and the owner or operator must obtain an individual SPDES permit
  prior to further discharges from the construction site.

  B. Effluent Limitations Applicable to Discharges from Construction Activities

  Discharges authorized by this permit must achieve, at a minimum, the effluent
  limitations in Part II.B.1.a., b., c., d., and e. These limitations represent the

  20

  Page 726 of 849