Part II.B.
degree of effluent reduction attainable by the application of best practicable
technology currently available.
1. Erosion and Sediment Control Requirements - The owner or operator must
  select, design, install, implement, and maintain control measures to minimize
  the discharge of pollutants and prevent a violation of the water quality
  standards. The selection, design, installation, implementation, and
  maintenance of these control measures must meet the non-numeric effluent
  limitations in Part II.B.1.a., b., c., d., and e. and be in accordance with the
  New York State Standards and Specifications for Erosion and Sediment
  Control (BB), dated November 2016, using sound engineering judgment.
  Where control measures are not designed in conformance with the design
  criteria included in the technical standard, the owner or operator must include
  in SWPPP the reason(s) for the deviation, or alternative design, and provide
  information in the SWPPP demonstrating that the deviation or alternative
  design is equivalent to the technical standard.

  a. Erosion and Sediment Controls. At a minimum, erosion and sediment
  controls must be selected, designed, installed, implemented, and
  maintained to:

  i. Minimize soil erosion through application of runoff control and soil
  stabilization control measure to minimize pollutant discharges; and

  ii. Control stormwater discharges, including both peak flow rates and
  total stormwater volume, to minimize channel and streambank
  erosion and scour in the immediate vicinity of the discharge points;
  and

  iii. Minimize the amount of soil exposed during construction activity;
  and

  iv. Minimize the disturbance of steep slope; and

  v. Minimize sediment discharges from the site; and

  vi. Provide and maintain natural buffers around surface waters, direct
  stormwater to vegetated areas and maximize stormwater infiltration
  to reduce pollutant discharges, unless infeasible; and

  vii. Minimize soil compaction. Minimizing soil compaction is not required

  21

  Page 727 of 849