Part II.C.2.b.i.2.
  documentation which demonstrates that all options were
  considered and for each option explains why it is considered
  infeasible.

  In no case shall the runoff reduction achieved from the
  newly constructed impervious areas be less than the
  Minimum RRv as calculated using the criteria in Section
  4.5 of the DM. The remaining portion of the total WQv that
  cannot be reduced must be treated by application of
  standard SMPs.

ii. Channel Protection Volume (CPv): Provide 24 hour extended
  detention of the post-developed 1-year, 24-hour storm event,
  remaining after runoff reduction. Where a CPv control orifice is
  provided, the minimum orifice size must be 3 inches, with
  acceptable external trash rack or orifice protection. The CPv
  requirement does not apply when:

  1. Reduction of the entire CPv is achieved by application of
  runoff reduction techniques or infiltration systems; or

  2. The 1-year post-development peak discharge is less than or
  equal to 2.0 cfs; or

  3. The site directly discharges to tidal waters, or a fifth order or
  larger water body (stream, river, or lake) where the increase
  in smaller flows will not impact the stream bank or channel
  integrity. However, the point of discharge must be
  adequately protected against scour and erosion by the
  increased peak discharge.

iii. Overbank Flood Control Criteria (Qp): Requires storage to
  attenuate the post-development 10-year, 24-hour peak discharge
  rate (Qp) to predevelopment rates. The Qp requirement does not
  apply when:

  1. the site directly discharges to tidal waters or fifth order or
  larger streams; or

  2. A downstream analysis reveals that overbank control is not
  required.