Part II.C.2.b.iv. iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate the post-development 100-year, 24-hour peak discharge rate (Qf) to predevelopment rates. The Qf requirement does not apply when: 1. the site directly discharges to tidal waters or fifth order or larger streams; or 2. A downstream analysis reveals that overbank control is not required. c. Sizing Criteria for Redevelopment Activity i. Water Quality Volume (WQv): The WQv treatment objective for redevelopment activity must be addressed by one of the following options, as outlined in Section 9.2.1. Redevelopment activities located in an Enhanced Phosphorus Removal Watershed (see Part III.B.3. and Appendix C) must calculate the WQv in accordance with Section 4.3 of the DM. All other redevelopment activities must calculate the WQv in accordance with Section 4.2 of the DM. 1. Reduce the existing impervious cover by a minimum of 25% of the total disturbed, impervious area. The Soil Restoration criteria in Section 5.1.6 of the DM must be applied to all newly created pervious areas; or 2. Capture and treat 100% of the required WQv, for a minimum of 25% of the disturbed redevelopment impervious area, by implementation of standard SMPs or reduced by application of runoff reduction techniques; or 3. Capture and treat 100% of the required WQv, for a minimum of 75% of the disturbed redevelopment impervious area, by implementation of a volume-based alternative SMP, as defined in Section 9.4 of the DM; or 4. Capture and treat 100% of the required WQv, for a minimum of 75% of the disturbed redevelopment impervious area, by implementation of a flow-through alternative SMP sized to treat the peak rate of runoff from the WQv design storm; or 27 Page 733 of 849