Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 734 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Part II.C.2.c.i.5.
  5. Application of a combination of 1 through 4 above that
  provide a weighted average of at least two of the above
  methods. Application of this method must be in accordance
  with the criteria in Section 9.2.1(A)(V) of the DM; or

  6. If there is an existing SMP located on the site that captures
  and treats runoff from the impervious area that is being
  disturbed, the WQv treatment option selected must, at a
  minimum, provide treatment equal to the treatment that was
  being provided by the existing practice(s) if that treatment is
  greater than the treatment required by options 1 through 5
  above.

  ii. Channel Protection Volume (CPv) is not required if there is 0%
  change to hydrology that increases the discharge rate and volume
  from the project site.

  iii. Overbank Flood Control (Qp) is not required if there is 0% change
  to hydrology that increases the discharge rate from the project site.

  iv. Extreme Flood Control (Qf) is not required if there is 0% change to
  hydrology that increases the discharge rate from the project site.

  d. Sizing Criteria for Combination of Redevelopment Activity and New
  Development
  Construction projects, that include both new development and redevelopment
  activity, must use SMPs that meet the sizing criteria calculated as an
  aggregate of the sizing criteria in Part II.C.2.a. or b. for the new development
  portion of the project and Part II.C.2.c. for the redevelopment activity portion
  of the project.

Part III. Stormwater Pollution Prevention Plan (SWPPP)

  A. General SWPPP Requirements

  1. A SWPPP must be prepared and implemented by the owner or operator of all
  construction activity covered by this permit. All authorized discharges must be
  identified in the SWPPP. The SWPPP must document the selection, design,
  installation, implementation and maintenance of the control measures and
  28

  Page 734 of 849