Part III.A.1. practices that will be used to meet the effluent limitations in Part II.B. and, where applicable, the SMP requirements in Part II.C. 2. The SWPPP must demonstrate consideration in narrative format of the future physical risks due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR Part 490, and associated guidance. a. The owner or operator must consider: i. the following physical risks due to climate change: (i) increasing temperature; and (ii) increasing precipitation; and (iii) increasing variability in precipitation, including chance of drought; and (iv) increasing frequency and severity of flooding; and (v) rising sea level; and (vi) increasing storm surge; and (vii) shifting ecology. ii. for each of the following: (i) overall site planning; and (ii) location, elevation, and sizing of: a. control measures and practices; and b. conveyance system(s); and c. detention system(s). 3. The SWPPP must describe the erosion and sediment control practices and where required, SMPs that will be used and/or constructed to reduce the pollutants in stormwater discharges and to assure compliance with the 29 Page 735 of 849