Part III.B.2.b.iii.1. 1. The eNOI is submitted in accordance with Part I.D. before January 29, 2027 for construction activities that are either: a. subject to governmental review and approval: i. where the owner or operator made any application to that governmental entity prior to the effective date of this permit; and ii. such application included a SWPPP developed using the 2015 Design Manual or equivalent to it; or b. not subject to governmental review and approval: i. where a fiscal allocation for the construction activities has been developed and approved by a governmental entity; and ii. the SWPPP was developed using the 2015 Design Manual or equivalent to it; and c. If SMPs are designed in conformance with Part III.B.2.b.ii., the SWPPP must include the reason(s) for the deviation or alternative design and a demonstration of equivalence to the DM; and d. If SMPs are designed in conformance with Part III.B.2.b.iii., the SWPPP must include supporting information or documentation demonstrating that Part III.B.2.b.iii.1.a. or b. apply; and e. The SMP component of the SWPPP must include the following: i. Identification of all SMPs to be constructed as part of the project, including which option the SMP designs conform to, either Part III.B.2.b.i., ii., or iii. Include the dimensions, material specifications and installation details for each SMP; and ii. A site map/construction drawing(s) showing the specific location and size of each SMP; and 35 Page 741 of 849