Text · page 740 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
Part III.B.1.c.vii. temporary sediment basins and structural practices that will be used to divert flows from exposed soils; and viii. A maintenance inspection schedule for the contractor(s) and subcontractor(s) identified in Part III.A.7. to ensure continuous and effective operation of the erosion and sediment control practices. The maintenance inspection schedule must be in accordance with the requirements in the BB technical standard; and ix. A description of the pollution prevention measures that will be used to control litter, construction chemicals and construction debris from becoming a pollutant source in the stormwater discharges; and x. A description and location of any stormwater discharges associated with industrial activity other than construction at the site, including, but not limited to, stormwater discharges from asphalt plants and concrete plants located on the construction site; and xi. Identification of any elements of the design that are not in conformance with the design criteria in the BB technical standard. Include the reason for the deviation or alternative design and provide information which demonstrates that the deviation or alternative design is equivalent to the technical standard. 2. SMP component – The owner or operator of construction activity identified in Table 2 of Appendix B must prepare a SWPPP that includes SMPs. a. SMPs must be designed in conformance with the applicable sizing criteria in Part II.C.2.a., c., or d.; and b. SMPs must be designed in conformance with the performance criteria: i. in the DM; or ii. equivalent to the DM if deviating from Part III.B.2.b.i.; or iii. in the New York State Stormwater Management Design Manual, dated January 2015 (2015 Design Manual), or equivalent to it, if the following criteria are met: 34 Page 740 of 849