Part III.B.1.c.iv.
  and any other construction activity at the site that will result in soil
  disturbance.

  1. The phasing plan must include:

  a. a map delineating and labeling the limits of soil
  disturbance for all phases of a project; and

  b. a table identifying the order and intended schedule of
  when each phase will begin and end its sequencing
  plan. The table must identify the total disturbed area
  for each phase at any one time and the total disturbed
  area for the overall project at any one time all on one
  timeline showing all overlapping quantities of
  disturbed area at any one time; and

  2. A sequencing plan for a specific phase must include:

  a. a table indicating the order and intended schedule of
  construction activities within a phase, and
  corresponding construction drawings with a
  description of the work to be performed; and

  b. all permanent and temporary stabilization measures;
  and

 v. A description of the minimum erosion and sediment control
  practices to be installed or implemented for each construction
  activity that will result in soil disturbance. Include a schedule that
  identifies the timing of initial placement or implementation of each
  erosion and sediment control practice and the minimum time
  frames that each practice should remain in place or be
  implemented; and

vi. A site map/construction drawing(s) showing the specific location(s),
  size(s), and length(s) of each erosion and sediment control
  practice; and

vii. The dimensions, material specifications, installation details, and
  operation and maintenance requirements for all erosion and
  sediment control practices. Include the location and sizing of any

  33