Part III.B.
B. Required SWPPP Contents

  1. Erosion and sediment control component - The owner or operator must
  prepare a SWPPP that includes erosion and sediment control practices.

  a. Erosion and sediment control practices must be designed:

  i. in conformance with the BB; or

  ii. equivalent to the BB if deviating from Part III.B.1.a.i.

  b. If the erosion and sediment control practices are designed in conformance
  with Part III.B.1.a.ii., the SWPPP must include a demonstration of
  equivalence to the BB.

  c. At a minimum, the erosion and sediment control component of the
  SWPPP must include the following:

  i. Background information about the scope of the project, including
  the location, type and size of project; and

  ii. A site map/construction drawing(s) with north arrows for the project,
  including a general location map. At a minimum, the site map must
  show the total site area; all improvements; areas of disturbance;
  areas that will not be disturbed; existing vegetation; on-site and
  adjacent off-site surface water(s); floodplain/floodway boundaries;
  wetlands and drainage patterns that could be affected by the
  construction activity; existing and final contours; locations of
  different soil types with boundaries; material, waste, borrow or
  equipment storage areas located on adjacent properties; and
  location(s) of the stormwater discharge(s) and receiving surface
  water(s); and

  iii. A description of the soil(s) present at the site, including an
  identification of the Hydrologic Soil Group (HSG); and

  iv. A phasing plan for the project and sequencing plans for all phases,
  both of which must address clearing and grubbing, excavation and
  grading, utility and infrastructure installation, final stabilization,