Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 766 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Appendix A
Performance Criteria – the six performance criteria for each group of SMPs in
Chapters 5 and 6 of the technical standard, New York State Stormwater Management
Design Manual (DM), dated July 31, 2024. These include feasibility, conveyance,
pretreatment, treatment, landscaping, and maintenance. It does not include the Sizing
Criteria (i.e. WQv, RRv, CPv, Qp and Qf) in Part I.C.2. of the permit.

Phase – a defined area in which construction activities are occurring or will occur
separate from other defined area(s).

Point Source – any discernible, confined, and discrete conveyance, including but
not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container,
rolling stock, concentrated animal feeding operation, vessel or other floating craft, or
landfill leachate collection system from which pollutants are or may be discharged.

Pollutant(s) – dredged spoil, filter backwash, solid waste, incinerator residue, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal,
agricultural waste and ballast discharged into water; which may cause or might
reasonably be expected to cause pollution of the waters of the state in contravention of
the standards or guidance values adopted as provided in 6 NYCRR Parts 700 et seq.

Qualified Inspector – a person that is knowledgeable in the principles and practices of
erosion and sediment control, such as a licensed Professional Engineer, Certified
Professional in Erosion and Sediment Control (CPESC), Registered Landscape
Architect, New York State Erosion and Sediment Control Certificate Program holder or
other NYSDEC endorsed individual(s).

It can also mean someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided that person has training in the principles and practices of erosion and sediment
control. Training in the principles and practices of erosion and sediment control means
that the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect has received four (4) hours of NYSDEC
endorsed training in proper erosion and sediment control principles from a Soil and
Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial
training, the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect shall receive four (4) hours of training
every three (3) years.

It can also mean a person that meets the Qualified Professional qualifications in
addition to the Qualified Inspector qualifications.

Note: Inspections of any SMPs that include structural components, such as a dam for
an impoundment, shall be performed by a licensed Professional Engineer.

  60

  Page 766 of 849