Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 767 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Appendix A
Qualified Professional – a person that is knowledgeable in the principles and practices
of stormwater management and treatment, such as a licensed Professional Engineer,
Registered Landscape Architect or other NYSDEC endorsed individual(s). Individuals
preparing SWPPPs that require the SMP component must have an understanding of the
principles of hydrology, water quality management practice design, water quantity
control design, and, in many cases, the principles of hydraulics. All components of the
SWPPP that involve the practice of engineering, as defined by the NYS Education Law
(see Article 145), shall be prepared by, or under the direct supervision of, a professional
engineer licensed to practice in the State of New York.

Redevelopment Activity(ies) – the disturbance and reconstruction of existing
impervious area, including impervious areas that were removed from a project site
within five (5) years of preliminary project plan submission to the local government (i.e.
site plan, subdivision, etc.).

Renewable Energy – electricity or thermal energy generated by renewable energy
systems through use of the following technologies: solar thermal, photovoltaics, on land
and offshore wind, hydroelectric, geothermal electric, geothermal ground source heat,
tidal energy, wave energy, ocean thermal, and fuel cells which do not utilize a fossil fuel
resource in the process of generating electricity.

Site Limitations – site conditions that prevent the use of an infiltration technique and or
infiltration of the total WQv. Typical site limitations include: seasonal high groundwater,
shallow depth to bedrock, and soils with an infiltration rate less than 0.5 inches/hour.
The existence of site limitations shall be confirmed and documented using actual field
testing (i.e. test pits, soil borings, and infiltration test) or using information from the most
current United States Department of Agriculture (USDA) Soil Survey for the County
where the project is located.

Sizing Criteria – the criteria included in Part I.C.2 of the permit that are used to size
SMPs. The criteria include; Water Quality Volume (WQv), Runoff Reduction Volume
(RRv), Channel Protection Volume (Cpv), Overbank Flood (Qp), and Extreme Flood
(Qf).

Steep Slope – land area designated on the current United States Department of
Agriculture (USDA) Soil Survey as Soil Slope Phase D, (provided the map unit name or
description is inclusive of slopes greater than 25%), or Soil Slope Phase E or F,
(regardless of the map unit name), or a combination of the three designations.

Stormwater – that portion of precipitation that, once having fallen to the ground, is in
excess of the evaporative or infiltrative capacity of soils, or the retentive capacity of
surface features, which flows or will flow off the land by surface runoff to waters of the
State.

  61

  Page 767 of 849