Appendix A
Streambank – the terrain alongside the bed of a creek or stream. The bank consists of
the sides of the channel, between which the flow is confined.

Stormwater Pollution Prevention Plan (SWPPP) – a project specific report, including
construction drawings, that among other things: describes the construction activity(ies),
identifies the potential sources of pollution at the construction site; describes and shows
the stormwater controls that will be used to control the pollutants (i.e. erosion and
sediment controls; for many projects, includes SMPs); and identifies procedures the
owner or operator will implement to comply with the requirements of the permit. See
Part III of the permit for a complete description of the information that must be included
in the SWPPP.

Surface Waters of the State – shall be construed to include lakes, bays, sounds,
ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, marshes,
inlets, canals, the Atlantic ocean within the territorial seas of the state of New York and
all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
public or private (except those private waters that do not combine or effect a junction
with natural surface waters), which are wholly or partially within or bordering the state or
within its jurisdiction. Waters of the state are further defined in 6 NYCRR Parts 800 to
941.

Temporarily Ceased – an existing disturbed area will not be disturbed again within 14
calendar days of the previous soil disturbance.

Temporary Stabilization – exposed soil has been covered with material(s) as set forth
in the technical standard, New York Standards and Specifications for Erosion and
Sediment Control, to prevent the exposed soil from eroding. The materials can include,
but are not limited to, mulch, seed and mulch, and erosion control mats (e.g. jute twisted
yarn, excelsior wood fiber mats).

Total Maximum Daily Load (TMDL) – the sum of the allowable loads of a single
pollutant from all contributing point and nonpoint sources. It is a calculation of the
maximum amount of a pollutant that a waterbody can receive and still meet water
quality standards, and an allocation of that amount to the pollutant's sources. A TMDL
stipulates Waste Load Allocations (WLA) for point source discharges, Load Allocations
(LA) for nonpoint sources, and a margin of safety (MOS).

Traditional Land Use Control MS4 Operator – a city, town, or village with land use
control authority that is authorized to discharge under New York State DEC’s SPDES
General Permit For Stormwater Discharges from Municipal Separate Stormwater Sewer
Systems (MS4s) or the City of New York’s Individual SPDES Permit for their Municipal
Separate Storm Sewer Systems (NY-0287890).

Trained Contractor – an employee from the contracting (construction) company,
identified in Part III.A.7., that has received four (4) hours of NYSDEC endorsed training
  62