Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 769 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Appendix A
in proper erosion and sediment control principles from a Soil and Water Conservation
District, or other NYSDEC endorsed entity. After receiving the initial training, the trained
contractor shall receive four (4) hours of training every three (3) years.

It can also mean an employee from the contracting (construction) company, identified in
Part III.A.7., that meets the qualified inspector qualifications (e.g. licensed Professional
Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered
Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided they have received four (4) hours of NYSDEC endorsed training in proper
erosion and sediment control principles from a Soil and Water Conservation District, or
other NYSDEC endorsed entity).

The trained contractor is responsible for the day-to-day implementation of the SWPPP.

Tree Clearing – construction activities limited to felling and removal of trees.

Tree clearing does not include hand felling and leaving the trees in place with no
support from mechanized equipment, which is not considered construction activity
requiring coverage under this permit.

Water Quality Standard – such measures of purity or quality for any waters in relation
to their reasonable and necessary use as promulgated in 6 NYCRR Part 700 et seq.

  63

  Page 769 of 849