Appendix B
  Table 1 (Continued)
  CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
  THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS

The following construction activities:

  • Slope stabilization
  • Slope flattening that changes the grade of the site, but does not significantly change the runoff
  characteristics
  • Spoil areas that will be covered with vegetation
  • Vegetated open space (i.e. recreational parks, lawns, meadows, fields, downhill ski trails) that do
  not alter hydrology from pre- to post-development conditions
  • Athletic fields (natural grass) that do not include the construction or reconstruction of impervious
  area and do not alter hydrology from pre- to post-development conditions
  • Demolition where vegetation will be established, and no redevelopment activity is planned1
  • Installation or replacement of either an overhead electric transmission line or a ski lift tower that
  does not include the construction of permanent access roads or parking areas surfaced with
  impervious cover.
  • Solar array field areas that have tables elevated off the ground, spaced one table width apart, do
  not alter hydrology from pre- to post-development conditions, and address water quality volume and
  runoff reduction volume by maintaining sheet flow on slopes less than 8%.
  • Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
  Management Practice Systems Catalogue” (dated June 2023) that do not include construction or
  reconstruction of impervious area and do not alter hydrology from pre- to post-development
  conditions.
  • Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious
  areas that will be restored to pre-construction conditions once the construction activity is complete
  (in this context, “temporary” means the impervious area will be in place for two years or less)
  • Other construction activities that do not include the construction or reconstruction of impervious
  area, and do not alter hydrology from pre- to post-development conditions, and are not listed in
  Table 2.

1. If the site is redeveloped in the future, a new eNOI must be submitted.

  65