Southtowns Record

Town Board agenda packet — September 16, 2026

Government
Town of Orchard Park
Board
Town Board
Meeting
Sep 16, 2026
Kind
Agenda packet
Topics
Budget and taxes, Zoning and land use, Public safety, Parks and recreation, Audits and oversight, Roads and traffic

Original document

Same meeting

Text · page 24 of 27

Read the whole document on one page (all 27 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Authorize a Site Plan and Building Permit for 3129 Orchard Park Road.

  RESOLVED, that the Town Board does hereby approve the following resolution upon the recommendation
  of the Planning Board from their July 9, 2026 and September 10, 2026 meetings:

  RESOLVED, with regard to P.B. File #02-26, 3129 Orchard Park Road, located in the old Valu plaza, Zoned
  B-2 (SBL #152.12-4-8 & 9). The Town Board approves the Site Plan and authorize a building permit for two
  out parcels, a parking expansion and associated Site improvements, based on the following conditions and
  stipulations.

  1.  All public notices have been filed.
  2.  This  is an Unlisted Action,  based  on the Short EAF  submitted  5/1/26,  and a Negative
  Declaration was made on 7/9/26.
  3.  The site lighting is limited to those fixtures and poles indicated on the approved Site Plan.
  Light fixtures shall have flat lenses and all lighting is to be directed downward and toward the
  site.
  4.  No outside storage or display is permitted.
  5.  Any future dumpsters shall be screened, in accordance with Section 144-25 of the Town Code.
  6.  The Applicant is to provide the Town of Orchard Park Assessor with an “independent”
  appraisal for the completed project (meaning all completed phases) by a Certified Commercial
  Appraiser.
  7.  A GML 239n referral was submitted to the ECDEP on 5/18/26. Comments were received on
  6/1/26. No recommendation was made.
  8.  The Site Plan dated 09/09/26 has been determined by the Building Inspector to be Compliant
  as presented.
  9.  Engineering Approval was granted on 9/10/26.