Southtowns Record

Board Packet 04.06.2026

Government
Village of Springville
Board
Village Board
Meeting
Apr 6, 2026
Kind
Agenda packet
Topics
Short-term rentals, Zoning and land use, Water, sewer and drainage, Budget and taxes, Housing, Public safety, Parks and recreation

Original document

Same meeting

Text · page 15 of 48

Read the whole document on one page (all 48 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

¥
  ammcawent yo, CA  A
  AGENDA DATE___ 3h (e/Be
oo  Village of Springville
  _ Historic Preservation Commission

  February 9,2026  .  7:00pm
  A meeting of the Historic Preservation Commission of the Village of Springville was held at the Municipal
  Building, 65 Franklin Street, Springville, New York at the above date and time. Present were:  .  i

  Members:  Bill Skura Chairman
  Helen Brogan-Absent
  Don Orton
  John Baronich-Vice Chairman
  Kelly Baker
  Mike Wolniewicz-Absent

  Also present:  Jessica Schuster
  David Batterson Jr.-105 East Hill Run, Springville
  Patricia Bailey-1350 E. Main St, East Aurora

  Clerk:  Jennifer Blumenstein

  After the Pledge of Allegiance, Chairman Skura called the meeting to order at 7:00pm

  Chairman Skura asked for a motion to approve the minutes from the January 12, 2026, meeting.

  John Baronich made the motion to approve the minutes, seconded by Don Orton. All in favor, none opposed.

  The only Certificate of Appropriateness application before the Board tonight comes from David Batterson, Jr. who
  is looking to convert the top floor of 26 Pearl Street into upscale apartments, «

  Dave Batterson Ir., along with Patricia Bailey from Bailey & Hartis Architects, presented the Board with a Site Plan
  and a Narrative statement describing all the work to be done to trausform the upstairs of 26 Pearl Street into
  apartments.

  The entry way to both apartments will be located on the south side of the building midway back with a small roof
  over the side door if the budget allows. The front apartment will have a small balcony with a view of the Village,
  and the rear apartment will have a small deck to access the yard.

  There will be new doors and windows on the front and rear elevations to comply with requirements for egress light  i
  and ventilation. The roof is an asphalt shingled roof with skylights. The electrical upgrades will be done and the  |
  apartments will be electrically heated and cooled.  i

  The lower level of the building will remain the same and be used as storage for materials for Springville Door and  :
  Window.  |

  Kelly Baker made ithe motion to approve this application as presenied with the stipulation that David Batterson  i
  comes back with any updates on color, siding, or changes to the project. Seconded by John Baronich. All in favor,
  none opposed.

  Don Orton made the motion to adjourn at 7:45 pm, seconded by John Baronich. All in favor, none opposed.

  Respectfully Submitted
  Jennifer Blumenstein