Southtowns Record

Board Packet 08.10.2026

Government
Village of Springville
Board
Village Board
Meeting
Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Audits and oversight, Energy and data center siting, Roads and traffic

Original document

Same meeting

Text · page 27 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

CHANGE ORDER FORM

  CHANGE  ORDER NO.: 3

Owner:  Village of Springville
Engineer:  Square Engineering D.P.C.
Contractor:  PPR Energy Solutions
Project:  EV Charging Station Project
  Springville

The Contract is modified as follows upon execution of this Change Order:
  Description: The Contractor will contract directly with the Utility {including payment of all fee’s}
  to upgrade the utility-side electrical service required to power the new charger. This scope was
  not included in the original contract.

  Change
  in Contract Price
Original Contract Price:

$  _162, 588.76
Contract Price prior to this Change Order:

$ _ 162, 588.76
tnerease
  this Change Order:

$  38,320.00
Contract Price incorporating this Change Order:

$ _ 200,908.76

  Authorized by Owner

By:
Title:  Signature

  Signature

  EFCDC® C-941, Change Order.
  Copyright® 2018 Hational Society of Professional Engineers, Americen Council of Engineering Companies
  and Amarican Sodaty of Civil Engineers. Alt rights reserved.